S/N |
DESCRIPTION |
COMPANY |
DATE |
1 |
Call Off Contract For Fabrication Services |
Addax Petroleum Development |
2010 - 2013 |
2 |
Provision of Onshore maintenance workshop services for ERHA FPSO |
ExxonMobil (EEPNL) |
2008-2011 |
3 |
Emergency Flow line Replacement |
|
2005-2006 |
4 |
Flow line Construction and replacement |
|
2006-2007 |
5 |
Fabrication of pipe spool |
|
2006-2007 |
6 |
Repair of 10" Export Line at Izombe to Ebocha |
Addax Petroleum Development |
Mar-2010 |
7 |
Fabrication and Hook-up of manifolds for Njaba crude |
Addax Petroleum Development |
Apr-2010 |
8 |
Grinding of Steering Mill to |
Weatherford |
27-Oct-08 |
9 |
Grinding of Steering Mill to |
Weatherford |
|
10 |
Recutting of 3½" IF pin % box |
Tecon Oil Service |
7-Nov-08 |
11 |
Recutting of 3½" FHC pin % box |
Tecon Oil Service |
7-Nov-08 |
12 |
Maching of pad eyes (boring of holes for shackles) |
|
12-Nov-08 |
13 |
Boring of 114 dia hole on 12mm thick plate |
|
17-Nov-08 |
14 |
Drilling of 2½" hole on 50mm plate |
|
23-Nov-08 |
15 |
Machine engine shim side clutch in line with given dwg. |
Novel Eng.Nig. Ltd. |
4-Dec-08 |
16 |
Machine engine shim side radiator in line with given dwg. |
||
17 |
Threading connector regular pin |
Tecon Oil Service |
16-Jan-09 |
18 |
Threading connector FH Box |
||
19 |
Threading FH Pin |
Tecon Oil Service |
19-Jan-09 |
20 |
Threading Reg.Box |
||
21 |
Threading IF Box |
||
22 |
Threading IF Pin |
||
23 |
Threading HTSS Box |
||
24 |
Re-threading both end (BTC Connector) 15 lght |
ABM Global Services |
22-Jan-08 |
25 |
Blasting and Painting of basket WF619 & WF621 |
Weatherford |
30-Jan-08 |
26 |
Blasting and Painting of basket WF630 & WF606 |
||
27 |
Blasting and painting of cement head rack, 20 pcs pad eye, 12 pcs u channel and 7 pcs of pipe |
||
28 |
Haulage and handling |
||
29 |
Threading connector HT55 |
Tecon Oil Service |
27-Jan-09 |
30 |
Pin & Box threading API-5L schedule 40 x 20xm length material supply and cutting |
Jeff Tony |
|
31 |
3" dia. Sch40 coated pipe to be threaded both end with NPT X 35mm length |
P.J. Engineering |
2-Feb-08 |
32 |
to turn out pipe from spiral shape to cylindecal shape |
Mr. Osita |
4-Feb-09 |
33 |
To remove the existing T.C.I from 14½" OD stabilizer and grid down to 14¼" OD |
Halliburton |
7-Oct-08 |
34 |
To remove the existing T.C.I from 15½" OD stabilizer and grid down to 15?"OD |
Halliburton |
7-Oct-08 |
35 |
Partial redressing on 15½" |
Halliburton |
7-Oct-08 |
36 |
Partial redressing on 15?" |
Halliburton |
7-Oct-08 |
37 |
Partial redressing on 12?" |
Halliburton |
7-Oct-08 |
38 |
Partial redressing on 12?" |
Halliburton |
7-Oct-08 |
39 |
Partial redressing on 15¾" |
Halliburton |
7-Oct-08 |
40 |
To remove the existing T.C.I from 11¾" OD stabilizer and grid down to 11¼" OD |
Halliburton |
7-Oct-08 |
41 |
To remove the existing T.C.I from 15½" OD stabilizer and grid down to 15"OD |
Halliburton |
7-Oct-08 |
42 |
Partial redressing on 12" OD Motor sleeve stabilizer |
Halliburton |
17-Oct-08 |
43 |
Partial redressing on 14¾" |
Halliburton |
28-Oct-08 |
44 |
To remove the existing T.C.I from 15?" OD stabilizer and grid down to 15½" OD |
Halliburton |
28-Oct-08 |
45 |
Re thread monel tubular joint OD 7½" x 74 lgth of 6?" Eeg. Box |
Halliburton |
31-Oct-08 |
46 |
Partial redressing on 12?" motor sleeve |
Halliburton |
29-Jan-09 |
47 |
Partial redressing on 12?" motor sleeve |
Halliburton |
29-Jan-09 |
48 |
Partial redressing on 12?" motor sleeve |
Halliburton |
29-Jan-08 |
49 |
Grind surface blade of 15¼" to 14½" OD |
Halliburton |
04/03/09 |
50 |
To remove the existing TCI from 15 5/16 |
Halliburton |
04/03/09 |
51 |
Partial redressing, grind the surface of the damage area 15½" |
Halliburton |
04/03/09 |
52 |
Cross-over Sub: 2 7/8" TT PAC Pin x 3 1/2" EUE BOX. |
Tecon Oil Service |
17-march-2009 |
53 |
Cross-over Subs: 3 1/2" EUE Pin x 2 1/2" TT Pac |
Tecon Oil Service |
|
54 |
Cross-over Subs: 2 7/8" TT Pac Box, x 2 3/8" IF |
Tecon Oil Service |
|
55 |
Grinding of stabilizer to 17 1/2" of 1/16 |
Tecon Oil Service |
|
56 |
Materia/Machinig of 13'' Pully. |
Chesroc Nig Ltd. |
24-march-2009 |
57 |
Extracting stucked pins and retapping with 7/16" on First Stage Stator |
Siemens Limited |
Nov. 7, 2009 |
58 |
Complete Overhaul of Danmar Air End Compressor |
EEPNL |
Oct. 2009 |
59 |
Machining of 2 Hubs for Instrument Air Compressor |
EEPNL |
Oct. 2009 |
60 |
Supply of Cement basket |
Weatherford |
12-09-05 |
61 |
Supply of Tubing racks and cargo Basket |
weatherford |
19-03-05 |
62 |
Supply and Installation of OD line Pipes |
Weatherford Nig. Ltd |
20-04-04 |
63 |
Recut 7-5/8” reg box conn. |
Petrodynamics Ltd |
21/2/06 |
64 |
Modify ABH bottom/adapter drillex tool. 8-5/8 special pin and box recut and parkerization |
Petrodynamics Ltd |
21/2/06 |
65 |
Recut 7-5/8 reg box conn |
Petrodynamics Ltd |
21/2/06 |
66 |
Recut 6-5/8 reg box conn. |
Petrodynamics Ltd |
21/2/06 |
67 |
Modify ABH bottom/adapter drillex tool. 8-5/8 special pin and box recut and parkerization |
Petrodynamics Limited |
21/02/06 |
68 |
Output shaft, machine crack on centre and rechase pin conn. (special conn) and pakerization |
Petrodynamics |
21/2/06 |
69 |
Repair services on breakout machine |
Halliburton Nig. Ltd |
14/3/06 |
70 |
Pipe Threading |
DWC Nig Ltd |
18/2/06 |
71 |
Machining /Welding of Piston Pullout |
Halliburton Nig. Ltd |
30/3/06 |
72 |
Fabrication of skips |
Tonal-Buchi Nig Ltd |
05/04/06 |
73 |
Recut 6 5/8” reg pin x box |
Halliburton Nig Ltd |
13/4/06 |
74 |
Recut OD tools R/pin x box |
Halliburton Nig Ltd |
04/05/06 |
75 |
Repair of wear out part of the jaws |
Halliburton Nig Ltd |
17/07/06 |
76 |
Redressing sleeve stabilizer |
Halliburton |
20/09/06 |
77 |
Build and grind to 15 7/8” motor stab |
Halliburton Nig Ltd |
05/10/06 |
78 |
Grind heatfill pitted sleeve stab |
Halliburton Nig Ltd |
11/12/06 |
79 |
Redress OD 17 ½ stab |
Halliburton Nig Ltd |
`6/04/07 |
80 |
Fabrication of 2.2m3 cutting skips |
Lambic Tech. And General Services |
27-7-05 |
81 |
Reconditioning of Pump Shaft |
Eleme Petrochemical Company Ltd |
26-01-04 |
82 |
Reconditioning of Turbine Rotor 1-PT-20IA |
Eleme Petrochemical Company Ltd |
23-03-04 |
83 |
Refurbishing the |
Eleme Petrochemical Company Ltd |
31-08-04 |
84 |
To bore, cut hole on ring to 40"x 36"x 4" |
Remm Oil Services |
4-05-03 |
85 |
Reconditioning of shafts, wear rings and |
Eleme Petrochemical Company Ltd |
06-10-03 |
86 |
Reconditions of 2 Pcs Pump Shaft and to Provide 5 pcs Bushings. |
Eleme Petrochemical Company Ltd. |
5-5-02 |
87 |
Reconditions pump Shaft N3-905 for P.E. Plant. |
Eleme Petrochemical Plant Nig. Ltd. |
|
88 |
(i) Reconditioning turbine Shaft (ii) Reconditioning of Bearing. |
Eleme Petrochemical Ltd. |
9-05-02 |
89 |
Reconditioning of 1" 4 Pcs station Hay Pivoted Shoe PAO (iii, 3 Pcs Stationary Pivoted Shoe PAD with temp sensor. |
Eleme Petrochemical Company. |
11-03-03 |
90 |
Furnish material and fabricate strong x 6 FT wire 1.D Loading saincey Sandblast & paints |
Star Ap |
29-6-01 |
91 |
Refurbish shaft for export vessel. |
Walvis Nig. Ltd |
1-07-02 |
92 |
Install Rings, 8 Weldings @ N1,800 per weld. |
Vetco-Gray |
13-11-01 |
93 |
Supply materials fabricate, sandblast |
Vetco – Gray |
10-10-01 |
94 |
Off-Set Riser Modification |
Star Ap |
14-11-02 |
95 |
Install 30"ML Landing ring into 30RLY intermediate Joint. 2 welds @ 1,800 per weld excluding x ray stress relieving |
Vetco Gray |
14-11-01 |
96 |
Reconditioning of turbine shaft & Bearing |
Eleme Petrochemical |
9-8-02 |
97 |
Manufacture of 12" Flanges Class 300 |
Amber Resources |
29-5-02 |
98 |
Supply Materials & Manufacture 12 Blind Flanges Class 300 as per specification. |
Amber Resources |
|
99 |
Supply materials & manufacture pin as sample. |
Weather ford Nig. Ltd |
10-1-02 |
100 |
Weld 36" x1.5" Box and Pin Connectors to 36" x 1.5 Pipe 2 Welds Per Pipe 4 Welds @ 2,800 Each. |
Vetco Gray Nig. Ltd. |
01-12-01 |
101 |
Equipment hire no. of days = 20 no. of Laborers = 20. 5% Vat inclusive |
Vetco Gray Nig. Ltd |
06-03-02 |
102 |
Supply materials fabricate, sandblast |
Vetco – Gray |
10-10-01 |
103 |
Weld 26"x 1" Landing Ring to 26"x1x" Pipe as per Vetco Specification |
Vetco Gray Nig. Ltd. |
2-12-02 |
104 |
Machining of 44" Dia of 2" Thick plate & mark as per drawing, material supplied by customer. |
Remm Oil services |
12-12-01 |
MSL's Job References